Chicago Train Service Restored After Bridge Work

Created: Last edited:
Syndicated ยท Original source
Green and Pink Line train service resumed in Chicago after bridge repairs. Work on the 110-year-old Lake Street Bascule Bridge includes leaf installation and track rehabilitation. Future shutdowns are expected this spring as part of a 2028 project.

Source: https://blockclubchicago.org/2026/10/29/green-pink-line-train-service-restored-downtown-after-shutdown/

Image: South_Branch_Chicago_River_2023a-scaled.jpg

#chicago #train #bridge #cta

Views: 8

Categories: Articles & Guides [c4], Chicago [c14], News & Updates [c3]

Manage / Login

The Bitcoin-Powered Internet Bulletin Board